Trenching & Excavation
Protective Systems
45 min · OSHA 29 CFR 1926 Subpart P · 2-question quiz
Trenching & Excavation — from the Anvil & Co. course library.
What you will learn:
• Choose sloping, benching, shoring or shielding.
• Understand soil types A, B, C and stable rock.
Key points:
• Required at 5 feet or deeper unless in stable rock; under 5 feet if a competent person sees cave-in potential.
• Maximum allowable slopes (Appendix B): Type A 3/4:1 (53°), Type B 1:1 (45°), Type C 1-1/2:1 (34°).
• Trench boxes and shoring follow the manufacturer's tabulated data — keep it on site.
• 20 feet or deeper: design by a registered professional engineer.
Scenario: You're digging an 8-foot sewer trench in previously disturbed soil (Type C). The box is too short. What are your options?